The condensate trap captures the discharge which builds up in the primary heating/cooling system. This is caused by the changes in the pressure and temperature within those systems. A discharge pipe linked to the condensate trap then allows any held water. Boiler spare parts must be fitted by a certified Gas Safe engineer. Orders received before 4pm are usually dispatched for next business day delivery.